Eventually, we (I mean YOU - the community of Blue Wing Inn lovers) will want to weigh in on the method of seismic upgrading.
Here is an article I found on the web from Roy Tolles, president of ELT about a complaint he has about the method proposed to be used on the Castro Adobe. He points out the proposed use of 6" cores instead of the recommended 2" cores. 6" cores remove far too much of the historic fabric of the Castro Adobe. Worth reading. Get yourself informed ;-)
Here is an article by the Getty Institute.
Their video.
Seismic Stabilization of Historic Adobe Structures Final Report of the Getty Seismic Adobe Project final report: "When disturbance of the wall surface is unacceptable, the use of center cores will avoid damage to wall surfaces."
I'm planning to video-interview project managers and adobe and seismic experts so we can ALL be informed about these issues.
Subscribe to:
Post Comments (Atom)
.jpg)
No comments:
Post a Comment
Note: Only a member of this blog may post a comment.